WE TAKE YOUR GAME SERIOUSLY

info@transtexastennis.com
5212 Werner Street, Houston, TX 77022
services detail

New Construction

Trans Texas Tennis is known for quality tennis court maintenance, installation, and construction. Contact us to learn all about our tennis court services, from new construction  & re-construction to surfacing and lighting.

New Court Construction & Post-Tensioned Concrete Engineering

Building It Right From the Start

One of the most critical decisions a facility owner, school district, or homeowner will make is selecting the proper construction method for a new court. Athletic surfaces are subjected to extreme environmental stresses, soil movement, and temperature fluctuations. Without the proper foundation, even a brand-new court can quickly develop costly structural cracks and uneven playing conditions.

The Gold Standard: Post-Tensioned Concrete Construction

At Trans Texas Tennis, we build every new court utilizing the Post-Tensioned Concrete Method, proven over the last 50 years as the industry’s most reliable solution for a structural crack-free foundation. Engineered to perform in virtually any soil condition or climate, post-tensioned slabs use high-strength steel cables embedded in the concrete. Once tensioned, these cables place the slab in permanent compression, holding the surface together tightly and delivering a trouble-free, high-performance court that outlasts traditional asphalt or standard concrete by decades.

Innovative Features & Advantages

Superior Crack Control: Built with high-tensile steel cables under active compression to resist ground movement and structural cracking.

Active & Positive Reinforcement: Provides structural strength throughout the entire slab, dramatically extending the lifespan of the facility.

Seamless, Uniform Surface: Engineered without unsightly expansion or control joints, providing a smooth, continuous field of play.

Precision Planarity & Slope Control: Allows for precise grade control to eliminate water accumulation (“birdbaths”) and optimize water drainage.

Integrated Infrastructure: Structural fence posts and net post sleeves are poured directly into the slab for maximum stability and clean aesthetics.

Inter-Court Integrity: Utilizes specialized metal keyways between adjacent courts for smooth transitions and long-term joint stability.

Unrivaled Base for Surfacing: Delivers a stable, non-porous foundation that maximizes the adhesion and longevity of premium acrylic color coatings.